glass partition system being installed. installation expected to be complete by the end of the week.
another view of glass partition system at perimeter offices
floating ceiling panels and light fixtures being installed at elevator lobby
carpet tile being installed
linoleum rolls
walnut credenza being installed at wall of honor
ductwork and drywall soffits being installed at elevator lobby
open area
views
wood doors
phase II - future wall of honor
interior storage rooms
lights being installed
new narrow radiator enclosure installed & old radiator
ceiling panels going up, pendant lights next
round supply diffusers hover between floating ceiling panels
Sorry we missed a couple of weeks, because we forgot to charge the digital camera before our site visit.
ceiling slab, ductwork, and sprinklers sprayed out
close-up, hangers ready for ceiling clouds
cabling to start. there is 66,000 feet of category 6 cable on this job.
core drills to IT Room on floor below completed and conduit installed.
pipes at perimeter boxed out. radiators installed, waiting for covers. window pocket installed
close-up detail of window pocket
elevator lobby post demolition. future home of the end grain wood block feature wall.
new electrical panels to be recessed mounted.
interior rooms framed and rocked. exposed slab prepped for painting. future open work area.